There will be Inlet manifold (land side & sea side) Inspection in Schermbeck – GERMANY on 08.09.2025. Requested control steps; • Dimensional Control before hydrotest • Visual Inspection before hydrotest • Hydrostatic Test • Documentation control (including signing relevant control reports and evaluation of NDT applications) • Final dimensional check after hydrostatic test • Preparing control report regarding to control items, and signing relevant steps of ITP Minimum required personnel qualification; • Inspector must have minimum 5 years experiences about piping and welding. • Inspector must have CSWIP 3.1 Welding Inspection Certification . • Inspector must have Radiographic(RT 2) Certification according to EN 9712
Bilgi: Muayene proje açıklaması firma yetkilisi tarafından belirtilen ölçüde gösterilir. Teklifinizi gönderdikten sonra, kontrol panelinizden detayları tekrar talep edebilirsiniz.
Başlangıç Tarihi :
Bitiş Tarihi:
Bütçe :
Durumu :
Qr kodu işin detayıdır. Paylaşın veya raporlarınızda kullanın.